Shutdowns

Plan turnarounds with work packages and a critical path.

Overview

A shutdown event holds work packages and tasks. A critical-path calculation (forward and backward pass, float, cycle detection) is recalculated on every task change. Cost against budget and weighted progress are shown.

Shutdowns in the Fixed Assets module.

When to use shutdowns

  • You run a planned plant shutdown.

Step by step

In Assets, open Verticals → Operations → Shutdowns.

Permissions

These permission keys control access (granted to roles in Administration → Roles & Permissions):

  • assets.shutdown.manage
  • assets.vertical.read

Automation

  • Changes on this screen are written to the asset audit trail and the asset timeline.